TinyURL.com/NY2012RegsResourceGuide
Please pass this along to other lists
You need to download 11 PDF documents to get all of the Regs and supporting documents.
You get get all 11 here in a single ZIP archive here:
(most computers have tools built in to read .zip files, buf if not, google search for "Free ZIP decoder")
To make an actual comment:
http://www.dec.ny.gov/energy/76838.html
BE SURE TO SAVE A COPY OF YOUR COMMENTS IN A TEXT FILE, or a WORD DOCUMENT.
Publish your comments to your email lists, to Facebook, or your blog.
ALSO submit your comments to NYAgainstFracking.org online form for tracking.
DEC does not make this easy and you have to REGISTER each time you want to make a new comment!
Here are the ONLY comment categories--
- 550.3 Definitions (related to all ECL Article 23 wells)
- 553.1 Statewide Spacing (related to all ECL Article 23 wells)
- 554.1 Prevention of Pollution and Migration (related to all ECL Article 23 wells)
- 554.7 Completion reports, Well Logs and Samples (related to all ECL Article 23 wells)
- 556.2(g) Sundry Notice and Report on Wells (related to all ECL Article 23 wells)
- 560.2 Definitions (related to high-volume hydraulic fracturing)
- 560.3 Application Requirements, Procedures and Fees (related to high-volume hydraulic fracturing)
- 560.3(b) Plat Requirements (related to high-volume hydraulic fracturing)
- 560.3(d)(1) Hydraulic Fracturing Fluid Disclosure (related to high-volume hydraulic fracturing)
- 560.4(a)(2) Setback from Inhabited Dwelling or Place of Assembly (related to high-volume hydraulic fracturing)
- 560.4(c) Setback Variance Procedure (related to high-volume hydraulic fracturing)
- 560.5(b) Emergency Management Office Notification (related to high-volume hydraulic fracturing)
- 560.5(d) Water Well and Spring Testing (related to high-volume hydraulic fracturing)
- 560.5(f) Drilling and Production Waste Tracking Form (related to high-volume hydrualic fracturing)
- 560.5(h) Hydraulic Fracturing Disclosure Following Well Completion (related to high-volume hydraulic fracturing)
- 560.6(c)(3) Blow-out Preventer Use and Test Plan (related to high-volume hydraulic fracturing)
- 560.6(c)(11) Surface Casing (related to high-volume hydraulic fracturing)
- 560.7(j) Production Brine Storage (related to high-volume hydraulic fracturing)
- 750-3 Reorganization of Regulations (related to high-volume hydraulic fracturing)
- 750-3.3(a)(6) Prohibition within 500 feet of Private Water Wells, Domestic Use Springs and Wells and Springs Used for Crops/Livestock (related to high-volume hydraulic fracturing)
- 750-3.3(a)(6) Prohibition within 500 feet of Private Water Wells, Domestic Use Springs and Wells and Springs Used for Crops/Livestock (related to high-volume hydraulic fracturing)
- 750-3.7(o) Groundwater Monitoring Program (related to high-volume hydraulic fracturing)
- 750-3.11(d) Operations Ineligible for HVHF GP Coverage which Require an Individual SPDES (related to high-volume hydraulic fracturing)
Please take part in the 30 Days of Fracking Regs
- http://thirtydaysoffrackingregs.com/
- https://www.facebook.com/pages/30-Days-of-Fracking-Regs/570728062944063
https://vimeo.com/55336946
Check for info here:
- Chip Northrup's analysis:
http://www.sourcewatch.org/index.php?title=Fracking_Regulations - Also check the ShaleshockMedia Blog
http://blog.shaleshockmedia.orgfor stuff by Chip and Bill Huston and perhaps others on the Regs.
If you have other suggestions for what should be here, please email WilliamAHuston@gmail.com
with subject: "2012 Fracking Regs Resource Guide"
No comments:
Post a Comment
Please enter your comment here. Spam and abusive posts will be removed.